Foundation treatment

PVD Project for Soft Foundation Treatment of Middle East Iraq Port Terminal Yard Expansion Project

Release time:Apr 12,2024
Number of views:
Share:


Project Name: PVD Project for Soft Foundation Treatment of Middle East Iraq Port Terminal Yard Expansion Project
 
Construction content: Foundation treatment PVD plastic drainage board and hole construction
 
Construction period: 12 months
 
Details:
 
The soft foundation treatment project for the expansion of the Iraqi port terminal yard is located in the Fao area of Basra Province in southern Iraq. It is the largest port in Iraq, while Fao at the mouth of the second largest city is the largest oil port.
 
1. Project Overview:
 
The engineering content includes the drilling operation of the drilling machine, the installation of PVD plastic drainage boards, measurement and laying out, the positioning of the drilling machine for drilling, the displacement of the drilling equipment, the positioning and installation of the drainage board machine, and the construction of buried plate heads
 
2. Geological conditions: The construction area is a reclamation area, and the surface soil of the site is filled with sandy silt soil. The silt layer is thick, with high water content, and the bearing capacity of the soft soil foundation is low.
 
3. Equipment used: Multiple drainage board PVD insertion machines, drilling equipment